A system for metal structures needs
people
who understand the requirements and know how to apply them.
This training course prepares participants to understand EN 1090 requirements and Factory Production Control and to apply them in practice within organisations manufacturing and installing steel and aluminium structures. We combine the standard requirements, the logic of production control and the operational realities of the sector so that participants not only learn the rules, but can translate them into quality, safety and repeatable execution.
Why do organisations
need a stronger understanding of EN 1090 and FPC?
The requirements may be known, but practical application is harder
In many organisations, the issue is not lack of access to EN 1090 and FPC requirements, but the absence of people who can translate them into real design, production and installation processes, as well as day-to-day quality control.
Production alone is not enough without control of the full process
Design, manufacture and installation form one chain of interdependencies. Without understanding the full sequence of activities, organisations lose consistency, repeatability and confidence in structural conformity more quickly.
The representative role is often underestimated
Organisations appoint people responsible for EN 1090 or FPC, but without proper preparation it is difficult for them to coordinate activities, support management and maintain effective oversight of the system.
FPC is sometimes mistaken for documentation alone
Factory Production Control is not just about having records in place. Without understanding the logic of monitoring and controlling production, the organisation does not use the system as a real quality management tool.
The relationship between EN 1090, FPC and ISO 9001 is not always clear
When a company knows the general quality system but does not understand how it connects to sector-specific requirements, implementation becomes less coherent and harder to manage effectively.
Weak understanding of the requirements costs more than it first appears
Incorrect interpretation of the standard, weak production oversight and an unprepared team lead to higher quality risk, rework, delays and lower delivery credibility.
We train in a way
that enables participants to understand and implement
This is not a training course based only on reviewing clauses of the standard. We design the programme so that participants understand the logic of EN 1090 and Factory Production Control, can relate the requirements to their own organisation and can consciously prepare the company for implementation, maintenance or development of a quality system for steel and aluminium structures. As a result, the training strengthens not only knowledge, but also the organisation’s ability to act effectively in practice.
Training scope
- EN 1090 requirements for the design, manufacture and installation of steel and aluminium structures
- Factory Production Control principles as a consistent and standardised method of controlling production
- Challenges related to implementing an EN 1090 management system
- Links and differences between EN 1090, FPC and ISO 9001:2015
- Practical integration of requirements into design, production and installation processes
- The role of people responsible for EN 1090 and FPC within the organisation
- Translating requirements into day-to-day oversight of quality and execution safety
What you gain
- Better understanding of the requirements: participants learn to read EN 1090 and FPC not only formally, but also in the context of the organisation’s real operating processes.
- Readiness to run the system: the training supports people who hold or will hold the role of EN 1090 / FPC Representative, as well as those involved in implementation.
- Greater awareness of production control: the team gains a clearer understanding of the logic of monitoring, evaluation and production oversight within the plant.
- A stronger process approach: the organisation better understands how to connect the standard requirements with design, production and installation.
- Better implementation readiness: you gain people who can translate EN 1090 and FPC requirements into real quality and organisational actions.
- Confirmation of participation: after completing the training, each participant receives a certificate of attendance and training materials.
Ask about training
for your organisation
Leave your contact details. Our process engineer will call you back within 24 hours, conduct a short needs review and prepare a training proposal tailored to the size and needs of your company.